Saturday, 28 May 2016

weekly production log - 2

This week was very busy, many pictures were taken of what camera angles we would take on live day, I was told that I would be assessed to be using camera 1, and while testing the camera, trying to see if it links with the monitors, I learnt that there was one wire that was broken and needed to be fixed. I was told that they would most likely fix it before the 18th which was good since it would be a big problem if my camera was unable to film on live day.

 Me,Asad and Ismail all separately made a list of camera positions that  we would be in. I talked to the other two camera operator, Asad and Ismail and they mainly told me that the only equipment my camera would be using would be the camera and the tripod, and my camera would be mainly focusing on the area where the presenter Jamain would be interviewing the guest, but I was also told that it might be changed and halfway through I might need to move my camera to be able to film the other presenters area where Faris would be talking about all of the celebrity gossip, but I would still need to confirm with Daniel to see if that is correct since he did not give me all of the details of if I would have to move the camera halfway through the show.

I took multiple pictures of the areas I would film and all of the equipment  that would be used for live day, such as the track, the wires, the plug, the broken wire and all three tripods.





 


No comments:

Post a Comment