This week we all discussed about live day, and we talked about the idea for the show that we were using, which was a mix of everyone's ideas, but mainly Jheevan's, which we all discussed about in a production meeting we had the week before. We also got to know what roles we had and I got chosen to be one of the three camera operators, along with Asad and Ismail, which meant we all had to go into the next classroom to see all of the equipment we use on live day.We all got to see what would be very risky to use when being camera operators on live day, such as when using the dolly we should make sure that we don't trip over it when moving it, personally i know this since I actually almost tripped over it when using it.
There are many risks that can occur when using the cameras on live day, such as accidentally tripping over the wires, and electrocuting yourself when removing wires from the wall, which explains why it has a "elecheck" warning on it.
Due to all of the risks that could happen, I made a risk assessment form explaining all of the risks and if they are likely to happen, and how I would be able to avoid the risk from happening.
Last thing was another production meeting, which unfortunately the other two camera operators were not there to talk. In the meeting we were talking about everything we have to do in the future and what we have already done for the work, which went very well.

No comments:
Post a Comment